ABT Meter Functions & Its Mechanism!

The ABT Energy Meters are specifically designed Three Phase, Four Wire static meters having accuracy class of 0.2S. Function of ABT meters is to measure the net energy transmitted in Wh in each 15-minute time block of real time along with the average frequency. This meters are designed to record reactive energy in VARh under the predefined high /low voltage condition.  

How does the mechanism work   

The process starts with the Central generating stations in the region declaring their expected output capability for the next day to the Regional Load Dispatch Centre (RLDC). The RLDC breaks up and tabulates these output capability declarations as per the beneficiaries' plant-wise shares and conveys their entitlements to State Load Dispatch Centres (SLDCs). The latter then carry out an exercise to see how best they can meet the load of their consumers over the day, from their own generating stations, along with their entitlement in the Central stations. They also take into account the irrigation release requirements and load curtailment etc. that they propose in their respective areas. The SLDCs then convey to the RLDC their schedule of power drawal from the Central stations (limited to their entitlement for the day). The RLDC aggregates these requisitions and determines the dispatch schedules for the Central generating stations and the drawal schedules for the beneficiaries duly incorporating any bilateral agreements and adjusting for transmission losses. These schedules are then issued by the RLDC to all concerned and become the operational as well as commercial datum. However, in case of contingencies, Central stations can prospectively revise the output capability declaration, beneficiaries can prospectively revise requisitions, and the schedules are correspondingly revised by RLDC.

     While the schedules so finalized become the operational datum, and the regional constituents are expected to regulate their generation and consumer load in a way that the actual generation and drawls generally follow these schedules, deviations are allowed as long as they do not endanger the system security. The schedules are also used for determination of the amounts payable as energy charges, as described earlier. Deviations from schedules are determined in 15-minute time blocks through special metering, and these deviations are priced depending on frequency. As long as the actual generation/drawal is equal to the given schedule, payment on account of the third component of Availability Tariff is zero. In case of under-drawal, a beneficiary is paid back to that extent according to the frequency dependent rate specified for deviations from schedule.  

For more details or clarifications and to know about  Advanced Power  Quality products Study & Completely Automated Report:  

Connect with Emerich Energy Please write to us info@emerich.in  Call: 044-48577667

Please subscribe our blog https://blog.emerich.in/
Follow us LinkedIn   https://www.linkedin.com/company/emerichenergy/